Views: 0 Author: RUIHUA HARDWARE Publish Time: 2015-07-09 Origin: RUIHUA HARDWARE
QUALITY CONTROL
Products Material: Strictly control the material used, make sure they can meet international requested standards, and maintain long working life.
Semi-finished products inspection: We examine the proudcts100% before finished. Such as Visual Inspection, Thread testing, Leak Testing, and so on.
Production line test: Our engineers will inspect machines and lines at fixed period.
Finished Product Inspection: We do the test according to ISO19879-2005, leakage test, proof test, re-use of components, burst test, cyclic endurance test, vibration test, etc.
QC Team :
A QC team with more than 10 professional and technical personnel. To ensure 100% products checking.
production is continuing, sharing some photos of hydraulic fittings
The Importance of Pressure Ratings and Testing for Hydraulic Fittings
It's the middle of 2019, expanding hydraulic fittings sales is our goal
After the Chinese new year, Production for Hydraulic fittings continues.
Global Hydraulic Fittings Market Sales Analysis and Opportunity